company is a system integrator, system integrators Russia, network integrator, system integration
LOGIN IN SYSTEM
close
SITE SEARCH
закрыть

software development technology




SEARCH
Contacts

«IMPULSE-IVC» (Ukraine, c. Kyiv)
Phone: +38 (093) 916-09-79
Phone/fax: +38 (044) 383-03-73
ivan23614@ukr.net
lesi@impuls-ivc.ua
Ivan Leshko



Technical project





The purpose of a technical project is to identify the main methods used to create an automated system and to determine its estimated cost.

The next development results:

  • system-wide solutions that are necessary and sufficient for the production of operational documentation of the system as a whole;
  • draft applications for the development of new technical means;
  • documentation of special mathematical and informational support.

All data is entered into a single document.

The technical design of the subsystems is carried out in accordance with the approved technical specification.

The technical project of the automated system describes in detail:

  • working places;
  • business operations executed on them;
  • their respective documents;
  • structures of processed databases;
  • data interconnections;
  • algorithms for their processing.

The technical design should include data on the volumes and intensity of the flows of the information being processed, the number of users of the automated system, the characteristics of hardware and software.

When developing a technical project, the following are issued:

  • Technical design note. General information about the project.
  • Explanatory note to the technical project. Introductory information that allows its consumer to quickly master the data of a particular project.
  • Description of classification and coding systems.
  • List of incoming data (documents). List of information used as an input stream and serves as a source of accumulation.
  • List of output data (documents). List of information used to analyze the accumulated data.
  • Description of the software used. The list of software and DBMS that are planned to be used to create an information system.
  • Description of the equipment used. A list of hardware tools, with which work is planned in the system being created.
  • Project assessment of system reliability. Expert assessment of reliability with the detection of the most successful parts of the automated system and its bottlenecks.
  • Equipment and materials list. List of equipment and materials that will be needed during the project implementation.
  • Tasks for the development of construction, electricity, network and other sections of the project.


«IMPULSE-IVC» - a system integrator of the construction industry. The developer of specialized software products on the platform BAF for construction: BAS Construction. Accounting, BAS Construction. Financial Management, BAS Construction. Construction production management, etc. Provided services - from the creation of a structured cabling system to the implementation of business software - guarantee a comprehensive approach in the development of information management systems for medium-sized businesses. A well-written scheme of project implementation allows minimizing possible risks, achieving the maximum result in working with clients. The quality management system "IMPULSE-IVC" is certified according to the international standard ISO 9001: 2008.

As the system and network integrator IMPULSE-IVC works only with products from well-known foreign and domestic manufacturers. Currently, our business software products are used by more than a thousand construction companies in Ukraine. We adhere to the privacy policy and reliably protect the business secrets of our customers. The IMPULSE-IVC projects embody the successful practical experience of the company combined with a high professional level of specialists and new technologies.


© «IMPULSE-IVC» (Ukraine), 2008-2019. All Rights Reserved.