IMPULSE-IVC is a developer of reliable integrated systems, which are used to perform all document management processes in construction. More detailed information is available on the website page:
https://www.impuls-ivc.ua/en/project-of-works-execution. BAS Construction Automation Program. Construction production management has the ability to easily generate and operate data such as a work schedule. Plan and keep records of resources and materials by drawing up a graphic document, such as a
construction schedule, as well as keeping inventory of construction machinery, tools and vehicles.
Schedule of construction machines is based on data from the
BIS calendar plan, as well as information on the need for technical resources. On the basis of these papers, the terms of performance of works are established with application of the mechanisms recommended by resource estimate norms or accepted on calculation of the information on actual existence of own construction equipment and available equipment in other organizations. This
construction machinery schedule clearly shows:
- terms of use of construction machines and mechanisms;
- the degree of equipment load;
- its presence on several construction sites;
- Lease other organizations.
The
Construction Machinery Schedule will show the name of the equipment, the number of machines, the variability of work, the average daily number of machines by days, weeks and months.
What is the construction schedule
The construction schedule connects the technological processes so that they are performed consistently and on time. Make it to determine and control the timing of work. To schedule: you need:
- building drawings;
- construction organization project;
- report on the supply of materials, structures, tools and equipment;
- information on the number of equipment and workers;
- availability of a technology map;
- data on subcontractors;
- Terms of commissioning of the facility.
BAS Construction Program. Management of construction production allows you to easily, relying on this information, to build a
construction schedule, gives the opportunity to justify the deadlines, approve funding, provide materials in the right period of time, approve the
work schedule and equipment for certain types of work. Based on the
construction schedule, using the software
ITS construction, you can make a schedule of delivery of materials, which will allow more rational distribution of construction supplies. Keep records and report on materials used and production work. Thus, information about what materials are needed will be delivered automatically. The
construction schedule looks like a table with a graphical component.
Why do you need a work schedule
Workforce schedule is required to provide the number of workers in one or all occupations. Its indicator is the maximum number of workers per shift and the uniformity of workload of workers in one profession. To avoid loss of working time, changes are evenly distributed according to the specialization of the employee. This ensures the continuous operation of construction crews and will create conditions for reducing economic and administrative costs. The longer the period of time with a constant number of employees in relation to the total duration of construction work, the more accurate is the
schedule of labor movement. The completed works are recorded in the
logbook of KB in the form of cumulative information on the performance of construction and installation works, and accepted by the customer. Based on these data, a standard form KB-2v and KB-3 is formed, which consist of payment invoices for the customer. At present, it is not necessary to keep a
journal of KB works.